Commit Graph

2 Commits

Author SHA1 Message Date
Tianyi Cui
f9cc62266c fix(tools): single ordered driver lane for the sub-dispatch scheduler; validate the cap
Responding to ds-review-bot round 2 on #658 (three critical findings, one
warning — all rooted in the pump/commit split racing ordered stages):

- ONE driver lane now owns every ordered stage: the start append, prepare
  (pre-execute/guards), and the head-of-line commit (post-execute, context
  deferral, settle append). start() is awaited before the next entry can
  start, so concurrent submissions can no longer run pre-execute pipelines
  concurrently; only the around-dispatch/body stage overlaps, matching the
  native loop's fillPool sequencing.
- An exclusive call's barrier now holds through its COMMIT: later starts
  wait for the exclusive pipeline (post-execute included) to finish, the
  native exclusive-group semantics.
- drainDispatches() awaits the driver run itself, so a commit already
  mid-flight when the program returns is drained before run_code closes
  the turn — the settle event and deferred contexts land inside it.
- maxParallelSubCalls is resolved and validated at construction (positive
  integer), so direct construction can no longer wedge the pool with 0.

New tests: overlapping-submission ordered-prepare, barrier-through-commit,
drain-mid-commit, cap rejection. 96 keyless snapshots replay unchanged;
Agent Note updated (both languages).
2026-07-26 15:26:52 +08:00
Tianyi Cui
8a79679489 feat(tools): live dispatch lifecycle + native-contract parallel sub-calls in Code Mode
The bridge replaces its serialization queue with a pool that reuses the
native concurrency contract: submissions classify through
registry.executionMode (fail-closed isConcurrencySafe), start strictly in
submission order, overlap up to the validated maxParallelSubCalls config
(default 10; 1 restores serial), and exclusive calls drain the pool, run
alone, and bar later calls. Each started sub-call logs a
tool/code-dispatch-start event at pool entry; the existing
tool/code-dispatch settles the pair (started ⇔ settles exactly once;
abandoned queued calls log neither). SDK prompt guidance now states the
true Promise.all contract — re-recorded across every code/both-mode
snapshot (plus the stale cordis-dynamic-toolchain fixture gaining the
required description arg).

Client: CodeSubCall widens to RunningToolCall | ToolResultNode — starts
land the running shape (rows wear the native running ring), settles
replace in place preserving start order, callTime pairs to the start
time. Fixture emits start/settle pairs; jsdom pins the running sub-row;
runtime specs pin in-place settlement and out-of-order completion.
2026-07-26 06:02:36 +08:00